Honest answer: it depends on the project. Every home is different, and things like surface condition, the number of repairs needed, drying time between coats, and weather (for exteriors) all affect the schedule. That said, here are realistic general estimates for each service we offer:
Single Room Interior
2–3 days
One bedroom or bathroom with standard 8-ft ceilings, minimal prep needed. Two coats, walls only. Trim adds a half day.
Full Floor Interior (3–5 rooms)
4–7 days
Living room, dining room, hallway, and one or two bedrooms including trim and ceilings. More rooms or high ceilings push toward the longer end.
Whole House Interior
7–14 days
Full interior including all rooms, stairwells, hallways, trim, and doors. Homes with significant drywall repair, multiple stories, or detailed trim work can run longer.
Exterior Standard Colonial or Cape
5–8 days
Includes pressure washing, scraping, caulking, priming, and two finish coats. Weather is the wild card on every exterior job. We don't paint in rain or below 50°F and we'll communicate any weather delays clearly.
Exterior Large Home or Complex Siding
8–15 days
Larger square footage, heavy scraping on older homes, or siding types that need more prep (cedar shingles, stucco, older wood) can extend the timeline considerably.
Cabinet Painting Kitchen
3–5 days
Disassembly and prep on day one, primer coats day two, finish coats days three and four, cure time and reinstall on day five. The kitchen is not fully usable during this window but we keep it livable.
Drywall Repair Patches
2–3 days
Small to medium patches including compound, sanding, and prime coat. If painting follows, add the interior painting timeline above.
Full Sheetrock Installation
5–14 days
Depends heavily on square footage and number of rooms. Hanging, taping, mudding, and sanding all require drying time between coats. A single room might be 3 days. A full basement or addition can run a week to ten days before it's paint-ready.
Wallpaper Removal
2–4 days per room
Old paper, multiple layers, or damaged drywall underneath can significantly extend this. We assess during the estimate and flag anything that might add time.
Deck or Fence Painting
3–6 days
Power washing on day one, dry time, then stain or paint application. Weather, deck size, and condition all affect the schedule. We won't coat a deck that's still wet from rain, ever.
Carpentry Trim, Chair Rail, Wainscoting
2–4 days
Depends on linear footage and complexity. Chair rail in one room is usually a day. Full wainscoting on multiple rooms takes longer. We include caulk, nail fill, and prime before handoff to paint.
These are general estimates, not guarantees. Your written proposal will include a specific timeline for your project based on what we see on-site. If anything changes once we start, we tell you immediately, not at the end.